ll HELP! Summit Home Energy Loan Program

ELIGIBLE ENERGY EFFICIENCY MEASURES

Category

Measure

Minimum Efficiency/Certification Requirements

Inspection Contact

Air Sealing & Ventilation

Air Sealing

Air sealing level must be measured by a blower door before and after improvements is made, & mechanical ventilation must be installed if air sealing reduces air changes per hour to below 0.35.

HC3

Duct Sealing

 

HC3

Insulation

Attic

R-49 minimum req. in open attic; R-38 in vaults or full cavity

Bldg Dept

Wall

R-21 minimum req., or fill wall cavity

Bldg Dept

Floor (over unconditioned space)

R-30 minimum

Bldg Dept

Ducts (in unconditioned space)

R-8 minimum

Bldg Dept

Foundation

R-10 minimum

Bldg Dept

Space Heating

High Efficiency Furnace

AFUE >= 90%, plus sealed combustion

Bldg Dept

Boiler

AFUE >= 85%

Bldg Dept

Radiant Heating (floor, wall and ceiling)

Radiant systems must be powered by a efficient gas boiler, solar system or heat pump (ground source, electric or gas), not electric.

Bldg Dept

Water Heating

On-demand/Tankless

Energy Factor of 0.82 or higher (ENERGY STAR labeled)

Bldg Dept

High efficiency gas storage tank

Energy Factor >= 0.62 (ENERGY STAR labeled).  R-16 tank insulation; antisiphon valves; and hot water pipe insulation of at least 6 ft.

Bldg Dept

Lighting

Fixtures, ballasts

T-4, T-5 or T-8 fixtures with electronic ballasts

HC3

Timers, sensors

 

HC3

Light Shelves

 

HC3

Windows, Doors & Skylights

Exterior Windows & Doors

Replacements only; not newly created windows and doors. U Value 0.35 or less. Permitted only as part of a package that includes air sealing and insulation, unless already completed or shown to be not needed by audit.

Bldg Dept

Storm Windows & Doors

Meets IECC in combination with the exterior window or door over which it is installed

HC3

Skylights

Upgrade only, not new skylights.  U-factor of 0.60 or less

Bldg Dept

Tubular Skylights

 

HC3

Wood, Gas & Wood Pellet stoves

Pellet Stoves

Only upgrades to more efficient model, not new stove installations, unless home does not have access to natural gas or inserting in open fire place.  Must meet EPA Phase 2 standard

Bldg Dept

High efficiency Fireplaces & FP inserts

Only upgrades to high efficiency model are eligible, not new installation, unless home currently uses electric heat or inserting into existing open fire place.  Must meet EPA Phase 2 standard

Bldg Dept

Renewable Energy
Systems

Solar PV, etc

This option is available within the town limits of Breckenridge only.  Please contact the Breckenridge Building Dept for more information

Bldg Dept



Email Newsletter icon, E-mail Newsletter icon, Email List icon, E-mail List icon Sign up for our Email Newsletter

UPCOMING EVENTS

Open House this Wednesday
for New Breckenridge
Recycling Center!
Join us for an informal open house for the new Breckenridge Resource Recovery and Education Center (BRREC) this Wednesday, February 1, from 6:00pm to 7:30pm, at the Breckenridge Recreation Center.
For more info, click here.




Facebook

One Percent for the Planet Recipient Logo

 

 MOUNTAIN PHOTOS COURTESY OF BOB WINSETT, WWW.BOBWINSETT.COM. WEB SITE DESIGN BY DANGER MARKETing, www.dangermarketing.com